For power plant desulfurization absorber towers, NHD offers specialized solutions for static duct and chimney lining, including titanium lining and titanium composite lining.
NHD contract alloy lining inside desulphurization absorption tower of one power plant in Shandong Province with 6×700MW unit, including supply of all C276 alloy plates, 1.4529 alloy plates, alloy pipes, flanges, electrodes, weld wires and site constructions.
The lining materials are Hastelloy-C276 Alloy, and supper austenitic 1.4529 manufactured in the United States.
Сплавные пластины разрезаны водой или ножницами.
Joint Welding between lining plate ensure the corrosion resistance at zone of joint welding. Intermittent fillet weld is used between alloy and carbon steel and overlap weld is used between lining plates.
Сварка подключения используется для получения хорошей прочности и ламинирования между подкладочной пластиной и опорной плитой.
Sprayer distribute slurry from circulating pump to each point. Each sprayer is consists of a manifold and dozens of branches, and slurry of absorption tower will be pumped through manifold and branches to the nozzles.
We provide customized solutions according to your needs.
Общая информация о продукте:
| Место происхождения: | Цзянсу |
| Фирменная марка: | Новая Хонга |
| Сертификация: | ISO, SGS |
| Номер модели: | / |